Oracle Primavera

Oracle Primavera

4.0
(61)
Optimized for quick response

Oracle's Primavera Enterprise Project Portfolio Management is the most powerful, robust, and easy-to-use solution for globally prioritizing, planning, managing, and executing projects, programs, and portfolios.

Work for Oracle Primavera?

Learning about Oracle Primavera?

We can help you find the solution that fits you best.

Oracle Primavera Reviews

Ask Oracle Primavera a Question
Write a Review
Filter Reviews
Filter Reviews
  • Ratings
  • Company Size
  • User Role
  • For Category
  • Industry
Ratings
Company Size
User Role
For Category
Industry
Showing 61 Oracle Primavera reviews
LinkedIn Connections
Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Verified Current User
Review Source
content

"Working Together with Oracle"

What do you like best?

Oracle offers a platform for general contractors to bring construction management into one very easy to use program. Have subcontractors do their product submittals, have general contractors review them and have the architects review and submit approvals or changes. This software also hosts a wide variety of different products as well for the construction industry. From payment systems like Textura, to analytics and project management options.

What do you dislike?

My experience with costumer support has been very sluggish and seemingly not very helpful when questions do occur. The product is not very agile and does take a while to learn how to correctly use each software.

Recommendations to others considering the product

When considering Oracle for Submittals and Project documents, I would strongly encourage you to look at Submittal Exchange. Keep in mind there are other programs out there like Procore or BuildingConnected with similar features. Oracle Primeveras Textura for payments is relatively easy to use as well for billing purposes, but easier solutions do exist.

What business problems are you solving with the product? What benefits have you realized?

This product is mainly used by my company to do project submittals and project payment applications. It is an easy to use platform once you have learned where to find each function. The benefits of this software compared to other software or no software I would say is ease of use/ everything in one place.

Sign in to G2 Crowd to see what your connections have to say about Oracle Primavera
Oracle Primavera review by Aaron G.
Aaron G.
Validated Reviewer
Verified Current User
Review Source
content

"Primavera Delivers"

What do you like best?

Primavera was developed by a team that understands construction. The software offers a variety of tools, from standard scheduling and critical path calculations to resource leveling. Primavera is a robust tool capable of complex calculations during the preconstruction phase and allows for easy updating during the project.

What do you dislike?

Primavera requires a decent amount of time allocated for training. and even then the system is not exactly intuitive. However, after you have been using the system for a month, these issues start to disappear. The other issue is that Primavera does not provide aesthetic tools for presentations but does allow for exporting your schedule to Microsoft Project where more formatting can be done.

What business problems are you solving with the product? What benefits have you realized?

We use Primavera for the whole construction process. During preconstruction, our superintendents use it to create a schedule and then update it throughout the process. Primavera is the perfect tool for taking their knowledge and making schedules for the project management team and owners.

What Construction Management solution do you use?

Thanks for letting us know!
Oracle Primavera review by User in Civil Engineering
User in Civil Engineering
Validated Reviewer
Review Source
content

"A simple yet a very advanced project management software"

What do you like best?

The software is very easy to learn it only took me a couple of days to learn it and start working on my first project with it. it has a lot of features and lets you include almost all of the details a project can have. It's very efficient for big projects with many branched activities. you can add all types of files you need to any section of the project so that it makes your project as inclusive as ever.

What do you dislike?

It needs to have better integration with third-party software so that we can export from it to other softwares. Graphics and user interface need get a nice boost.It doesn't have a mobile platform only works on desktop.

Recommendations to others considering the product

It's the one of the best professional project management softwares

What business problems are you solving with the product? What benefits have you realized?

We used Primavera for our construction projects. It was very very handy and saved us a lot of time. it has all the features a complex type of projects like the construction projects would need: budgeting, WBS, EPS, Calendar, Resources, timeline and floats. We also could attach to it any type of file we needed so that all the data we would need can be found in one place.

Oracle Primavera review by User
User
Validated Reviewer
Review Source
content

"makes managing client accounts incredibly easy"

What do you like best?

i like that it's designed around Windows, but can still be used on a Mac. We have some devices that are company-issued that are all Windows centered, but still have a couple of project-purchased Apple products. it's definitely easy enough for us all to use, but count on still having to do a little bit of manual input (still saves lots of time though!).

What do you dislike?

it's definitely formatted around managing bigger accounts - we wouldn't use this for managing different projects under different clients. we can set KPI's but it isn't the easiest to view which KPI's belong to which project. something just a quick update would fix

Recommendations to others considering the product

we enjoy using this but still have to rely on our internal team to create our own documents. wish there was just a bit more integration!

What business problems are you solving with the product? What benefits have you realized?

it gives our company a way for different heads of projects/clients to contribute data to the same software which saves us lots of manual input time

Oracle Primavera review by User
User
Validated Reviewer
Review Source
content

"Review for Primavera P6"

What do you like best?

I like the comprehensiveness it possesses, the quality of user interface it offers, and the speed with which it works. I would recommend it to every user; novice or pro.

What do you dislike?

I do not like the fact that it is a little more than too detailed. More than too often, we are confused by the various unknown features or features that are way above our level and expertise.

Recommendations to others considering the product

You should have a basic knowledge of project planning and scheduling concepts which helps in the long run. Also, you should have a basic understanding of how MS Project works, because it will help you use P6 more efficiently.

What business problems are you solving with the product? What benefits have you realized?

I used it for project planning and scheduling. I also used it for cost input of various activities that helped me get a cost loaded schedule.

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Verified Current User
Review Source
content

"Best Scheduling Software"

What do you like best?

Easy to use and understand. Project management becomes easy with a software like this. It helps in generating reports as per the clients needs. We can make changes without breaking a sweat. Can generate Gantt Charts as per our requirement.

What do you dislike?

Print feature and settings needs to be fixed. There are bugs in it. While exporting the file the size automatically crosses 4-5MB coz of the bug in the software which has to be fixed immediately.

Recommendations to others considering the product

Its currently the best software for project management and once you start using it you wont switch ever. With minimal training anyone can start generating schedules on it. Very Easy to understand. Every function is there in the software.

What business problems are you solving with the product? What benefits have you realized?

We do all our schedules on this software only. Being in construction it becomes easy to manage a complicated schedule on primavera.

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Review Source
content

"Better Than Some, Worse Than Others"

What do you like best?

It is very easy to use as well as to learn. I also appreciate that the modules speak to each other so items don't have to be attached in different places.

What do you dislike?

The limitations of the characters are aggravating and there is more information that would be helpful if there was a place to enter it.

Recommendations to others considering the product

I think it is a mid-level, acceptable program. I liked Timberline much better but Oracle is still worlds better than Viewpoint, which is what we switched to and are currently using.

What business problems are you solving with the product? What benefits have you realized?

We use it to produce our purchase orders and subcontracts and to track our compliance. It is much easier than having to send an email to others in the company every time we create these forms or upload something.

Oracle Primavera review by Sean K.
Sean K.
Validated Reviewer
Verified Current User
Review Source
content

"Great PPM software for mature and complex Enterprise environments."

What do you like best?

1. Overall the tool allow for Roadmap planning and manage small to large programs.

2. Ability to create plan template so PM/Team Leads can plan from template with complete SDLC like project with ability to customize for each project. Improves planning cycle and plan completeness for delivery.

3. Resource Planning is easy across all or portfolio of projects.

4. Ability to use to track and manage Business projects

5. Easy to integrate with Project Costing tools to manage CapEx projects and financial systems

What do you dislike?

For small/lightweight projects this can be overkill tool to manage projects. Keep the plan simple and repeatable for these projects and report on key milestones as an example (Can be overcome by using plan template for small/repeatable projects.

Learning curve for someone that has only used MS Project is a challenge. People that have used other PM products other than MS Projects has easier time.

Time to address bugs in application can be challenged depending on relationship with Oracle.

Recommendations to others considering the product

- Invest the time and money to train users on how to use the tool to improve the adoption and usage of the product.

- Reporting across multiple projects is limited in product for advanced reporting look into using Primavera Portfolio Management module. You may find PPM V6 meets your needs which we did as well initially.

What business problems are you solving with the product? What benefits have you realized?

Drive consistent project plans and metrics to manage and measure project progress. Also to plan Roadmap projects and define resource demand by skills for these project to understand skills demand to our current workforce.

Oracle Primavera review by Daniel F.
Daniel F.
Validated Reviewer
Verified Current User
Review Source
content

"Proper Project Management"

What do you like best?

Oracle Primavera is straight forward and easy to use. Allows a lot of power and functionality without too much complication.

What do you dislike?

The interface has a rather old-fashioned feel to it. It's written for modern operating systems, however, can have a Windows 98 feel sometimes.

Recommendations to others considering the product

Oracle Primavera is one of the top names in the business for project management. I'd recommend it in a heartbeat.

What business problems are you solving with the product? What benefits have you realized?

My group uses Primavera primarily for time tracking purposes. We can easily enter our hours, as does other groups, thus projects throughout the company can be effortlessly assessed regarding who's doing the work and how much time is being dedicated.

Oracle Primavera review by Stephanie C.
Stephanie C.
Validated Reviewer
Verified Current User
Review Source
content

"Great for a more complex project but not for me"

What do you like best?

Primavera is very customizable and if you have the right training, you can really get a lot out of the software (great schedule baselining, tracking, management, and reporting).

What do you dislike?

It's a very cumbersome software and takes a good amount of training to become efficient with it.

Recommendations to others considering the product

if your project has a higher level of complexity and you need very intricate reporting abilities, this software has all of the bells and whistles. I think it's a great software, just not for a more straightforward project.

What business problems are you solving with the product? What benefits have you realized?

Unfortunately, the series of projects that I'm working on move very quickly and change often. Since I'm newer to the software, it seems like it takes too much effort to get what I could really get out of the MS Project Enterprise software. I mentioned this in another review for Project, but P6 is like Lamborghini you have that you never actually drive anywhere unless it's for a special event since the Camry gets the job done with less gas and more comfort/peace of mind.

Oracle Primavera review by Frank "Mac" S.
Frank "Mac" S.
Validated Reviewer
Verified Current User
Review Source
content

"Cumbersome and overly complicated"

What do you like best?

This is a very powerful and feature rich tool.

What do you dislike?

This tool requires so many mouse clicks and offers more features than most people need. It is very overwhelming and has a steep learning curve.

Recommendations to others considering the product

Be careful before you switch. There is a lot of intense training required to learn the software.

What business problems are you solving with the product? What benefits have you realized?

Project management

Oracle Primavera review by Angelique  H.
Angelique H.
Validated Reviewer
Review Source
content

"Modules covering your projects from Soup to Nuts"

What do you like best?

Primavera modules cover the entire project...

Preconstruction and budgets to Mobilization through closeout

What do you dislike?

With any software,, to track completely and thoroughly, Alot of work on the front end to set up is necessary.. My experience with this software seemed to have quite a bit more than other programs I've used.

Plan storage & Drawing references, Punch Lists and grid area set ups need major tweaking.

Recommendations to others considering the product

Check out Procore first!

What business problems are you solving with the product? What benefits have you realized?

Tying in all contracts, commitments, PCO s and CORs

Oracle Primavera review by Mike M.
Mike M.
Validated Reviewer
Verified Current User
Review Source
content

"Good Product, upgrades made are good"

What do you like best?

The ability to use multiple products and combine together

What do you dislike?

Product is very expensive and it is slow moving between modules

Recommendations to others considering the product

Good product but expensive and lots for work getting it implemented correctly.

What business problems are you solving with the product? What benefits have you realized?

Allowing to combine accounting with scheduling with project management

Oracle Primavera review by Simon C W.
Simon C W.
Validated Reviewer
Review Source
content

"P6 "

What do you like best?

That SQL is now the database of choice. It is an industry standard, but the industry should do better.

What do you dislike?

Legacy 20 year upgrades that are memory hungry and unwieldy. Needs a big data rethink....... Clean sheet of paper...... Project grouping and number of projects needs to be rethought......

What business problems are you solving with the product? What benefits have you realized?

Fprensic delay analysis and interim programme management on major investments - Not many

Oracle Primavera review by Manish S.
Manish S.
Validated Reviewer
Verified Current User
Review Source
content

"Fast and intuitive"

What do you like best?

Very easy to track and manage project resources and split the hours across multiple tasks. It has excellent reporting capabilities as well to give a real time view to the management about the project health and overall status.

What do you dislike?

Somewhat difficult to update the tasks dependencies for bulk tasks

Recommendations to others considering the product

Its a tool for mid to large size project and definitely better compared to other project management tool available in the market

What business problems are you solving with the product? What benefits have you realized?

We have many projects involving different workstreams or line of business. For such projects involving multiple workstreams, Primavera helps track the work separately. This has made the resource tracking available real time and convenient

Oracle Primavera review by Administrator
Administrator
Validated Reviewer
Review Source
content

"I like it ok but I feel like there are better options"

What do you like best?

I like that it stores a lot of data and is easy to search.

What do you dislike?

It's slow, didn't load/upload fast enough

Recommendations to others considering the product

It's not a bad product, but we are currently beta testing some newer products because this one just did not suit our business needs. It did the job ok, but there were bugs and it just didn't have the right feel for our company. It was more costly in terms of time wasted and having to create additional work to track all the things we needed. We are beta testing a new program that makes oracle seem alot like the AIM days of messenger.

What business problems are you solving with the product? What benefits have you realized?

None, I'm actually currently seeking new products that can do what oracle does better

Oracle Primavera review by User in Oil & Energy
User in Oil & Energy
Validated Reviewer
Verified Current User
Review Source
content

"Project Manager Review of P6"

What do you like best?

The program simple to use and provides all the tools and features necessary to develop and execute a schedule effectively.

What do you dislike?

The report building and charting features could use some overal hauling. The report builder is difficult to use develop custom reports and modify existing reports to meet individual needs.

What business problems are you solving with the product? What benefits have you realized?

I was prompted to use the program by my Vice President. He has extensive experience and has been a good mentor to date. Being a Microsoft guy and mainly on MS Project my learning curve was less than a green user. The problem of having incosistent schedules have been solved and we are not running with what is consider a industry standard.

Oracle Primavera review by Executive Sponsor in Telecommunications
Executive Sponsor in Telecommunications
Validated Reviewer
Review Source
content

"review of Oracle Primavera"

What do you like best?

a lot of feature to completely manage projects and project portfolio

very stable product

good support

What do you dislike?

high price and maintenance costs

quite complex architecture of solutoin

Recommendations to others considering the product

make a good plan for implementation - what and how you Will cover in your projects

define policites and rules before implementation

check what integration with other applications do you need and how you Will implement them.

check pricing and evaluate best scenario for implemenation (on-premise installation or maybe use solution in the Cloud)

What business problems are you solving with the product? What benefits have you realized?

completely manage anc control projects (for costumers, internal projects)

product development is done over running different projects

also managing rsk on projects

Oracle Primavera review by User
User
Validated Reviewer
Review Source
content

"Primavera Review"

What do you like best?

1) easy to understand

2) can be used to handle complicated projects

What do you dislike?

1) dull user interface

2) the fact that you cannot change or know the float of activities that have been completed in the past.

You can only change the activities happening in the present and the ones about to happen in the future.

Hence, people are moving to a different software called NetPoint which uses Graphical Path Method instead of the Critical Path Method that is used by Primavera.

What business problems are you solving with the product? What benefits have you realized?

Scheduling of Construction Projects

Oracle Primavera review by User
User
Validated Reviewer
Review Source
content

"Definitive tool for CAPEX projects"

What do you like best?

The robstuness and complete features to manage huge CAPEX projects is what makes Primvavera the definitive solution for large and complex capital projects.

What do you dislike?

Should have more advanced analytics in line with the new era of digital, but still outstanding.

Recommendations to others considering the product

You need to invest time and training efforts in order to deeply understand the solution. But once you are adapted to the learning curve, you will take advante of this complete solution.

What business problems are you solving with the product? What benefits have you realized?

Program Management

Portfolio Management

Capital Projects Management

Progress tracking Management

Oracle Primavera review by User in Civil Engineering
User in Civil Engineering
Validated Reviewer
Verified Current User
Review Source
content

"Oracle Primavera Schedule and Contract Management Tool"

What do you like best?

I love these applications for the construction industry. Right now these are the best applications to utilize on construction projects big and small.

What do you dislike?

For contract management some portions of the applications are antiquated. The applications are also very pricey since being purchased by oracle.

Recommendations to others considering the product

It is the best in the construction industry.

What business problems are you solving with the product? What benefits have you realized?

I utilize this to manage contracts throughout the life time of the project. It is easy to use, once you have learned how to utilize one aspect of the application you can utilize most of the other portions of the product.

Oracle Primavera review by User
User
Validated Reviewer
Review Source
content

"Project Schedule"

What do you like best?

It is an excellent software for construction work, and it is essential for a construction company.

Deal with the project schedule, and you can add activities manpower and materials.

What do you dislike?

It is not easy to use, you should read about it and/or take a course.

You should have construction background to deal with.

Recommendations to others considering the product

Anyone in construction field should try it, makes the project easier to be on the right track.

What business problems are you solving with the product? What benefits have you realized?

Is dealing with construction projects timing so that the companies can meet the target date for site completion.

Oracle Primavera review by Steve H.
Steve H.
Validated Reviewer
Review Source
content

"Primavera Scheduling Platform Review"

What do you like best?

Primavera, when compared to other scheduling products may seem complex and overwhelming at first, but I have used it in many different applications for resource loaded and non resource loaded schedules. When the program settings are set up correctly it is an easy program to use and can be used at an advanced or basic scheduling level of understanding. Other products do not have this flexibility.

What do you dislike?

The amount of options to set to get a simple or advanced schedule system are difficult to navigate if you are unfamiliar with the product, there should be standard setups with standard settings for various project & schedule types.

Recommendations to others considering the product

Review the training guides and use the support Oracle offers, ensure you review and play with all the settings. Typical errors come when users aren't familiar with calendar types, assigning work hours to resources and creating calendar work schedules that differ between resources and activity types.

What business problems are you solving with the product? What benefits have you realized?

I have used Primavera for scheduling industrial (energy sector) construction projects and have realized benefits of robust critical path analysis, resource leveling and forecasting as well as large schedule EVMS applications to report earned value.

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Verified Current User
Review Source
content

"Robust scheduling software with a wide variety of applications"

What do you like best?

- Fast, efficient scheduling of activities

- Lots of customisation of views

- Ability to incorporate costs, resources, labour, etc

- Baseline comparisons

- Programming of filters

What do you dislike?

- Steep learning curve

- Little usage outside large construction companies

- Some tools are difficult to locate

- Few visual reporting tools

Recommendations to others considering the product

Invest in proper training to get full use of software

What business problems are you solving with the product? What benefits have you realized?

- Construction Scheduling

- Resource Management (Crane Hook scheduling)

- Critical Path Monitoring

- Baseline Comparison

- Resource Leveling (Labour)

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Verified Current User
Review Source
content

"Primavera P6"

What do you like best?

I like that it's a fairly easy program to start using. Creating a project and adding activities is pretty straightforward. I also like that it can be resource loaded and used for more than just scheduling. It will keep track of earned value as well which is very beneficial.

What do you dislike?

I think my biggest complaint about P6 is it doesn't make use of some of the typical computer operations. For example, in almost any program when you right click on something it selects it and gives you a drop-down menu of options. In P6 you can right click and get a drop-down menu but it will be for the item selected previously. Right clicking doesn't not also select the item so you have to be careful not to make changes to when thing when you think you're making changes to another. Also, you can't double click on a project to open it. You have to select it, then right click and choose open. It seems like small things but when you're in a rush to get things finished it slows you down.

Recommendations to others considering the product

P6 is the way to go if you want to get into scheduling. More and more companies are using this software.

What business problems are you solving with the product? What benefits have you realized?

At my current company we don't use P6 to its fullest. We strictly use it for scheduling. The advantage to using it though is that many of our clients require that we submit our schedule to them in P6 so we would limit ourselves by not using it.

Oracle Primavera review by Executive Sponsor in Aviation & Aerospace
Executive Sponsor in Aviation & Aerospace
Validated Reviewer
Review Source
content

"A powerful project management tool"

What do you like best?

Primavera s a very robust project scheduling tool, capable of scheduling, resource forecasting and management across an enterprise.

What do you dislike?

Primavera has a very steep learning curve.

Recommendations to others considering the product

When deploying it is critical to find highly trained and experienced users to administer it.

What business problems are you solving with the product? What benefits have you realized?

We use Primavera to develop integrated project schedules that allow us to see all work content across the entire business overlayed on itself. In addition, it allows us to manage our resources, allowing us to budget resources and record actual time spent on a project.

Oracle Primavera review by User
User
Validated Reviewer
Review Source
content

"Primavera P6 EPPM"

What do you like best?

Oracle Primavera can be used by a standalone windows application, web client or mobile client, it ssupports multiple projects, simultaneous multi-user access and resource control capabilities with support for multi-tiered project hierarchies, nice charts and customizable views.

What do you dislike?

1.- Oracle Primavera is ver very expensive.

2.- Oracle Primavera P6 Client work _only_ on Windows Operating System.

3.- Oracle Primavera should implement 2FA or another security system authentication.

4.- Oracle Primaver mobile application for not can be used with self-signed SSL certificate on the server.

5.- Primavera EPPM versión 8.3.1.0 (B029) is not certifcate with RAC by provider/vendor.

Recommendations to others considering the product

You should consider issues with java version and license purchasing.

What business problems are you solving with the product? What benefits have you realized?

We have a PMO team, they facilitates project communication, roles and responsibilities between all IT teams and organization directors.

Oracle Primavera review by User
User
Validated Reviewer
Verified Current User
Review Source
content

"Primavera P6"

What do you like best?

Ease of use, graphics, reporting features, it is the industry standard

What do you dislike?

Web version is very different from the client version. Needs to be one single web based application. Can't work remotely in the client version effectively.

What business problems are you solving with the product? What benefits have you realized?

We use it for scheduling all of our projects.

Oracle Primavera review by Rajeev N.
Rajeev N.
Validated Reviewer
Review Source
content

"User Friendly!"

What do you like best?

The reporting feature. Able to create amazing reports, in a highly detailed and efficient manner.

What do you dislike?

Everyone is allowed to manipulate data. This is not good in a matrix environment - it can allow for many mistakes.

Recommendations to others considering the product

Take a training class to know the depth of the product. Make sure that you are in control of your own customized views, to make project management easier for you.

What business problems are you solving with the product? What benefits have you realized?

Allocating resources to project, and budget tracking for projects. Primavera is very useful in making sure budgets are in green, as well as knowing what resources are billing to which activities.

Oracle Primavera review by Julianna M.
Julianna M.
Validated Reviewer
Review Source
content

"Primavera Review"

What do you like best?

Scheduling capabilities. Linked activities.

What do you dislike?

User interface is convulutedis ggetting better with the user interface

What business problems are you solving with the product? What benefits have you realized?

Use it for scheduling. Primavera Web services are great and Primavera Web is getting a lot better.

Oracle Primavera review by David C.
David C.
Validated Reviewer
Review Source
content

"Underused product in firm"

What do you like best?

Our company uses Primavera to track Capital improvements. It can take schedules and costs as well as various phases of the project

What do you dislike?

Not very user friendly and our company is probably only using about 20% of the capabilities of Primavera. Training for the program has a high learning curve.

Recommendations to others considering the product

have staff be properly trained in all aspects of the program since it can be overwhelming.

What business problems are you solving with the product? What benefits have you realized?

Tracking of capital improvements among the many assets our company manages and must keep in good working condition

Oracle Primavera review by William T.H. C.
William T.H. C.
Validated Reviewer
Verified Current User
Review Source
content

"A review of a powerful project management software "

What do you like best?

Seamlessly integrated all aspects of project scheduling, portfolio management, resource management and earned value analysis all on one platform

What do you dislike?

Some incompatability with other project scheduling softwares such as Microsoft Project when doing import or export.

Recommendations to others considering the product

It is a MUST for project managers, schedulers to use and master this software as this is one of the most advanced and practical solution to all project scheduling solutions and if not, it is like you have never use a smart phone in this modern world.

What business problems are you solving with the product? What benefits have you realized?

Project scheduling, resource allocation and earned value management.

Oracle Primavera review by Yunlong(Tommy) X.
Yunlong(Tommy) X.
Validated Reviewer
Verified Current User
Review Source
content
Business partner of the vendor or vendor's competitor, not included in G2 Crowd scores.

"Primavera P6 makes Project Management easier"

What do you like best?

The web interface is easy to use. The new team-member is much better than before which we are now using to assign tasks to different department for status update.

What do you dislike?

JRE compatibility with CM. Some users need to use both P6 and CM. They use different version of JRE which is difficult to handle.

Recommendations to others considering the product

It would be good if there are more types of graphs available.

What business problems are you solving with the product? What benefits have you realized?

Primavera helps us update and maintain project schedules. Team member makes it easier to cooperate among different use groups.

Oracle Primavera review by Pedro J.
Pedro J.
Validated Reviewer
Verified Current User
Review Source
content

"Enjoyable software"

What do you like best?

Simplicity, Complexity, its enjoyable to use, everyone can use it without any problems.

What do you dislike?

I have nothing to dislike in this software.

What business problems are you solving with the product? What benefits have you realized?

Im Just a employe, i cant solve any problems

Oracle Primavera review by Vince D.
Vince D.
Validated Reviewer
Verified Current User
Review Source
content

"Primavera P6R8.3 Best Planning Tool on the Market"

What do you like best?

Very versatile tool for activity and resource planning. The capacity planning module through the web allows you to see resource spreads across multiple projects.

What do you dislike?

The inability to show different duration types in one layout.

Recommendations to others considering the product

If you are looking for a database for multiple users updating schedules and for resource forecasting, Primavera is a great product.

What business problems are you solving with the product? What benefits have you realized?

Engineering, Procurment, Transportation, and Installation planning focused on critical paths. Benefits of seeing what is driving activities for the successful completion of the project.

Oracle Primavera review by Administrator in Mechanical or Industrial Engineering
Administrator in Mechanical or Industrial Engineering
Validated Reviewer
Review Source
content

"Overall great experience "

What do you like best?

I like the ease of setting up and using multiple projects at once. I can open one project at a time or open multiple projects at once to see what's happening with my resources. I also like the ease of setting up project specific resources.

What do you dislike?

I dislike the cost feature in Primavera. It's not easy to setup and very hard to actually track. It's best to take primavera training since trying to figure out how to use it as you go is very hard to do. The help feature hasn't been very helpful to me in the past.

Recommendations to others considering the product

Yes I do recommend oracle. The biggest issue is ease of installation. This program is a nightmare to install!

What business problems are you solving with the product? What benefits have you realized?

We are solving resource issues as a company. We've been able to setup individual projects and resource load them. We can pull all the projects together and see where our bottle necks are at. We've benefited in our engineering department by being able to forecast where our work load is light and heavy.

Oracle Primavera review by User in Oil & Energy
User in Oil & Energy
Validated Reviewer
Review Source
content

"Project Management & Scheduling"

What do you like best?

P6 is data driven. What helps is it allows you to customize the reports as per the organization needs. Based on the organization size and needs, the software can be customized. Many times for small organizations/ Or small projects, inputting complex data is not required while for larger projects complex data analysis is needed. P6 platform fits into both small as well as big organization needs. This also helps to start with small project with minimum data change the schedule as the project grows.

What do you dislike?

P6 is a data driven software platform. As you work, any input/changes is reflected live. Its difficult to Undo the changes. May be an automated snapshot backups allowing the user to document or undo the changes might be helpful

Recommendations to others considering the product

Attend Oracle Training. Its very informative and helpful. There is lot to learn and it will give you a jump start.

What business problems are you solving with the product? What benefits have you realized?

We have been using P6 for both doing Engineering Scheduling as well as helping the clients to do construction schedules. Schedules details depends from Level 1 to Level 5 depending on the projects.

Oracle Primavera review by User in Legal Services
User in Legal Services
Validated Reviewer
Verified Current User
Review Source
content

"Oracle Primavera R8.4"

What do you like best?

There really is no best thing about the software but we use out of necessity as most of our clients are forced to use the software.

What do you dislike?

The customer service and support for the product is not very strong and are usually unable to solve problems.

Recommendations to others considering the product

Make product easier to use. Improve customer support. Make product less expensive.

What business problems are you solving with the product? What benefits have you realized?

We utilize the product to perform forensic CPM schedule analysis for construction disputes.

Oracle Primavera review by Administrator
Administrator
Validated Reviewer
Review Source
content

"Primavera Review"

What do you like best?

I like the tools and planning within the software. I wish that there were Primavera booths available at the Oracle convention

What do you dislike?

The service has been sliding for supporting the client version of the software. It is all around the web version.

What business problems are you solving with the product? What benefits have you realized?

We are currently planning 5 billion dollars worth of programs, the integration of the programs are important.

Oracle Primavera review by User
User
Validated Reviewer
Verified Current User
Review Source
content

"A good project portfolio management software. "

What do you like best?

It has the good integration with the SAP and it has good risk analysis and make the very handy to use and primavera uniquer is good.

What do you dislike?

It is complex and needs user training for the doing the use and make the productive industry.

What business problems are you solving with the product? What benefits have you realized?

We ar using it for the PPM PURPOSE.

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Verified Current User
Review Source
content

"Resource utilization is key in this portfolio's management."

What do you like best?

The ability to oversee an entire portfolio in one application. Having the ability to see resource utilization for each stack in the portfolio helps to see staffing constraints.

What do you dislike?

Software at times can crash if not enough system resources or network is too slow.

Recommendations to others considering the product

Citrix implementation is nice for licensing, but can cause issues if teams are remote (on less than desired networks) or are on machines that don't have the best system resources.

What business problems are you solving with the product? What benefits have you realized?

We are solving staffing constraints by being able to see where specific roles are needed, and are overworked.

Oracle Primavera review by User in Oil & Energy
User in Oil & Energy
Validated Reviewer
Review Source
content

"Primavera is an excellent tool for planning and scheduling of projects."

What do you like best?

Its user friendly interface makes it very easy to learn and work with.

What do you dislike?

Sometimes, the customer service takes a long time to get back to you on issues.

Recommendations to others considering the product

Improve the customer service for users

What business problems are you solving with the product? What benefits have you realized?

I used it for planning oil and gas projects. Its very beneficial because it lets you adjust dynamic changes that may take place throughout your project.

Oracle Primavera review by Riccardo F.
Riccardo F.
Validated Reviewer
Review Source
content

"Great piece of software"

What do you like best?

We still use this at SITE for our projects, especially the P6

What do you dislike?

Licensing for it as soon as Oracle took over.

What business problems are you solving with the product? What benefits have you realized?

Scheduling for porjects.

Oracle Primavera review by Consultant in Management Consulting
Consultant in Management Consulting
Validated Reviewer
Review Source
content
Business partner of the vendor or vendor's competitor, not included in G2 Crowd scores.

"Get schedule and resource loading tool"

What do you like best?

once you learn how to use it, its fairly easy to crank out high complex schedules. the user interface is easy and the database options to recreate similar schedules is a breeze.

What do you dislike?

Initial set up can be painful and if its your first time using the software, definitely get a book or a starter course to get familiar with it.

Recommendations to others considering the product

do it and don't look back, but get training for a super user or a pool of users.

What business problems are you solving with the product? What benefits have you realized?

I use the software for electric utility projects that are complex, expensive multi year projects.

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Verified Current User
Review Source
content

"Excellent management tool"

What do you like best?

The sequencing of work activities. Ease with scheduling

What do you dislike?

Undo options,rewriting and undo does not work in all the cases

What business problems are you solving with the product? What benefits have you realized?

Construction management

Oracle Primavera review by User in Utilities
User in Utilities
Validated Reviewer
Verified Current User
Review Source
content

"Great experience with Primavera P6"

What do you like best?

The ability to perform resource loading of schedules

What do you dislike?

Having to manually move successor tasks once predecessor tasks are actualized

What business problems are you solving with the product? What benefits have you realized?

Working on a mega project has allowed me to use P6 to monitor contractor performance

Oracle Primavera review by User in Aviation & Aerospace
User in Aviation & Aerospace
Validated Reviewer
Review Source
content

"Industry Powerhouse"

What do you like best?

Most comprehensive planning software available - the only product I'll use!

What do you dislike?

Fields are not available for fill-down in the activities view detail tabs

Recommendations to others considering the product

It's the only choice. No other planning product comes close.

What business problems are you solving with the product? What benefits have you realized?

Primavera is the best software for producing a fully networked, resource loaded schedule to manage any program.

Oracle Primavera review by Administrator in Construction
Administrator in Construction
Validated Reviewer
Verified Current User
Review Source
content

"building construction"

What do you like best?

The capabilities of the software is great and am interested in learning more to become a more comfortable user.

What do you dislike?

Needs a Keep it simple mode for small project planning/scheduling.

What business problems are you solving with the product? What benefits have you realized?

Accuracy in work flow and abilities to identify problems.

Great tool for communicating to owners and subcontractors on the projects.

Oracle Primavera review by User in Construction
User in Construction
Validated Reviewer
Review Source
content

"There's a learning curve"

What do you like best?

That the software could do complicated scheduling and that it could potentially cost load info.

What do you dislike?

It's so clunky and hard to use. I'm used to things being more intuitive. This was not.

What business problems are you solving with the product? What benefits have you realized?

We were scheduling these huge projects. It handled complicated schedules easily and with no problems.

Oracle Primavera review by Madeleine B.
Madeleine B.
Validated Reviewer
Review Source
content

"Possibly great for a large organisation to track work but not a great user experience"

What do you like best?

You can manage and record a lot of information about projects and programmes.

What do you dislike?

It is clunky to use for planning projects. I would use excel to plan my projects first before adding to Primavera. So I found Primavera didn't help me save time as I would expect a project management tool to do.

What business problems are you solving with the product? What benefits have you realized?

The organisation I worked for used Primavera to solve the business problem of lack of visibility and having disperate ways of recording project and programme information. It was used as a one stop shop for collecting, viewing and reporting on projects and programmes of work

Learn more about Oracle Primavera

Oracle Primavera Videos

Kate from G2 Crowd

Learning about Oracle Primavera?

I can help.
* We monitor all Oracle Primavera reviews to prevent fraudulent reviews and keep review quality high. We do not post reviews by company employees or direct competitors. Validated reviews require the user to submit a screenshot of the product containing their user ID, in order to verify a user is an actual user of the product.